# What Is Workforce Management (WFM)?

Canonical: [What Is Workforce Management (WFM)?](https://contactcenter.me/glossary/workforce-management/)

Locale: en

Purpose: Workforce management (WFM) forecasts contact demand, converts it into staff, builds schedules and tracks adherence. See the steps and an example.

Content updated: 2026-11-25

Source revision: website build 2026-11-25 (generated from the published HTML of this page)

Maintenance owner: ContactCenter.me editorial team (BroadNet Technologies)

[Topic map: Reference](https://contactcenter.me/llm/topics/reference.md) · [Complete content map](https://contactcenter.me/sitemap.md)

Workforce

*What Is Workforce Management (WFM)?*

Workforce management (WFM) forecasts contact demand, converts it into staff, builds schedules and tracks adherence. See the steps and an example.

**The short answer**

Workforce management (WFM) is the planning process, and the software that supports it, for putting the right number of skilled agents on shift in each interval. It covers forecasting demand, calculating required staff, building schedules, managing changes during the day and measuring schedule adherence against plan.

### The WFM cycle
- Forecast contacts and handling time per interval.
- Convert demand into required agents with Erlang C, Erlang A or a workload model.
- Add shrinkage for breaks, training, meetings and absence.
- Build schedules that match the requirement interval by interval.
- Manage intraday: reforecast, move breaks and call in or release staff.
- Review adherence, forecast error and service level, then adjust.

### A worked example

A queue expects 100 calls in a 30-minute interval with an AHT of 240 seconds. Offered load = 100 × 240 ÷ 1800 = 13.33 Erlangs. For a target of 80% answered within 20 seconds, with occupancy no higher than 85%, Erlang C gives 17 agents. That yields 81.0% service level and 78.4% occupancy.

With 30% shrinkage, the roster need is 17 ÷ (1 − 0.30) = 24.3, rounded up to 25 scheduled agents for that interval. The 80/20 target is a common convention, not a standard.

### What WFM measures

Planners track forecast accuracy, schedule fit (required versus scheduled per interval), shrinkage, occupancy and adherence. Adherence = minutes in the scheduled state ÷ scheduled minutes × 100. Each of these explains a different reason service level was missed.

### Common mistakes
- Planning from daily averages. Intraday peaks drive the need.
- Counting the same unavailable time in both shrinkage and occupancy.
- Running multi-skill or messaging queues through a single-queue model without adjustment.
- Treating adherence as a discipline score instead of a check on whether the plan was workable.

### Questions about WFM

#### Do small contact centers need WFM software?

Not always. A small single-queue team can forecast and schedule in a spreadsheet with an Erlang calculator. Software becomes useful when you have several queues, skills, channels, part-time patterns or frequent intraday changes that are hard to manage by hand.

#### What is the difference between WFM and scheduling?

Scheduling is one step of WFM. WFM also includes the forecast that drives the schedule, the staffing math, intraday management and the review that tells you whether the forecast or the schedule caused a missed target.

#### How does WFM handle email and messaging?

Messaging and email need different math from voice. Chat agents may handle several conversations at once, and email can wait hours inside a due time. Plan those channels with concurrency or backlog models, then combine the results with the voice requirement when building shared schedules.

### Sources
- [ContactCenter.me Erlang C staffing calculator (method)](https://contactcenter.me/tools/erlang-c/)
- [ContactCenter.me workforce shrinkage calculator (method)](https://contactcenter.me/tools/shrinkage/)

Reviewed by the ContactCenter.me editorial team. [How we write definitions](https://contactcenter.me/editorial-policy/)

### Related terms
- [Call volume forecasting](https://contactcenter.me/glossary/call-volume-forecasting/)
- [Schedule adherence](https://contactcenter.me/glossary/schedule-adherence/)
- [Agent occupancy](https://contactcenter.me/glossary/occupancy/)
- [Erlang C queueing model](https://contactcenter.me/glossary/erlang-c/)
- [Queue service level](https://contactcenter.me/glossary/service-level/)

### Related questions
- [What is shrinkage in a call center and how do I calculate it?](https://contactcenter.me/answers/what-is-shrinkage-call-center/)
- [What does an 80/20 service level mean and what target should I set?](https://contactcenter.me/answers/service-level-80-20/)

#### Next step

[Erlang C staffing calculator](https://contactcenter.me/tools/erlang-c/) · [Workforce shrinkage calculator](https://contactcenter.me/tools/shrinkage/) · [Schedule adherence and conformance calculator](https://contactcenter.me/tools/adherence/) · [Turn shrinkage assumptions into a roster that covers the shift](https://contactcenter.me/blog/shrinkage-roster-coverage/) · [Prepare interval demand data before running a staffing forecast](https://contactcenter.me/blog/interval-forecast-data-preparation/) · [Inbound staffing explained: workload, Erlang C and shrinkage](https://contactcenter.me/blog/inbound-staffing-basics/) · [All glossary terms](https://contactcenter.me/glossary/) · [Questions & answers](https://contactcenter.me/answers/)
