Forecast calls and handle time for each interval, turn each interval into required agents with Erlang C, and add shrinkage. Then choose shift start times, lengths and breaks that follow that curve as closely as your rules allow. Staffing every interval at the peak wastes hours; staggered starts and part shifts close the gap.
What are the steps?
Gans, Koole and Mandelbaum describe the standard chain: interval forecasts give a required number of agents per interval, and a scheduling model chooses shifts that cover those numbers at the lowest cost within labor rules.
- Forecast calls and AHT by 15- or 30-minute interval.
- Calculate agents on the phones per interval for your service level target.
- Add shrinkage you can plan, such as breaks, coaching and training.
- Pick shift patterns allowed by law, contracts and agent preferences.
- Place breaks and lunches in the quieter intervals.
- Publish, then track adherence and re-forecast.
What does a worked example look like?
Take a morning from 8:00 to 13:00 at 240 seconds AHT and an 80/20 target. The Erlang C method gives the agents needed in each half-hour. The total is 148 agent half-hours. Staffing all ten intervals at the 19-agent peak would use 190, so 42 half-hours, or 21 agent hours, would sit idle or be wasted.
Staggered starts close most of that gap: a few agents at 8:00, more at 9:00 and 9:30, and a short shift or part-timers for the 10:00 to 11:30 peak.
| Interval | Calls | Agents |
|---|---|---|
| 08:00 | 40 | 8 |
| 08:30 | 60 | 11 |
| 09:00 | 85 | 15 |
| 09:30 | 100 | 17 |
| 10:00 | 110 | 19 |
| 10:30 | 105 | 18 |
| 11:00 | 95 | 17 |
| 11:30 | 90 | 16 |
| 12:00 | 80 | 14 |
| 12:30 | 70 | 13 |
How do you add shrinkage?
Divide the agents needed by one minus shrinkage. At 30% shrinkage the 19-agent peak needs 19 / 0.70 = 27.1, so 28 scheduled. Do not add breaks twice: if you place breaks in the schedule itself, leave them out of the shrinkage percentage.
How do you keep the schedule working?
Measure adherence, which shows whether agents are on the planned activity at the planned time. Compare actual calls and AHT with the forecast each week. Where gaps repeat, change the shift pattern rather than asking supervisors to fix it every day. Review the patterns at least each season, and give agents some choice of shifts, which helps retention.
What are the common mistakes?
Building shifts from a daily average, so mornings run short and afternoons run long. Placing all breaks at the same time. Scheduling training and coaching in the busiest intervals because that is when supervisors are free. Forgetting that part-time and split shifts cost agents time and travel, which can raise absence if they are imposed without discussion. Leaving no room in the plan for the random variation that every interval has.
Sources
- Gans, Koole and Mandelbaum: Telephone Call Centers: Tutorial, Review, and Research Prospects (Manufacturing & Service Operations Management, 2003)
- ContactCenter.me Erlang C calculator: method
- ContactCenter.me workforce shrinkage calculator: method
- ContactCenter.me schedule adherence calculator: method